Installation manual
iPRO 5000 Series TN/TS Analyzer Installation Procedure
Page 6 of 37 Version 1.2
4.2 Packing List
The packing list consists of a number of ancillary items sent with the Instrument and
accessories necessary to put the system in operation. In addition a number of consumable
items are included which may be used when commissioning the instrument. Check the
packing list supplied with the equipment and report deviations if they occur.
Note: See Appendix A below for details of parts that will be shipped with a new instrument.
Section completed:
4.3 Pre-Installation Requirements
Ensure that the requirements detailed in the Pre-Installation Checklist are met in the user’s
chosen location. See the latest version of the Pre-Installation Manual for iPRO 5000 Series
TN/TS Analyzer for the exact details. Tick each box and the section complete.
Action Completed
Location of units planned
Suitable work benches provided
Fume extraction system installed and commissioned
Electrical socket outlets available for the Instrument and all accessories
Gas supplies available and tested
Filters for gas supply available and tested (optional)
PC and printer present and according specifications
Customer trainees available
Table 3.1 Summary Pre-Installation Checklist
Section completed: