Installation Manual
33
5350 485 GB 08/2007
Installation of boiler
Unpacking the appliance
The appliance is supplied in 2 separate packages plus any optional flue packages. Check the
availability and contents of each package before commencing the installation.
Boiler package
Combi boiler
• Boiler (assembled) with control fitted
• 5 shut-off valves + CH and Gas pipe tails
• Wall mounting fixture
• 2 wall plugs and 2 screws
• Installation template
• Installation instructions
• Service instructions
• User instructions
• Warranty registration
System boiler
• Boiler (assembled) with control fitted
• 3 shut-off valves + CH and Gas pipe tails
• 2 connection elbows
• Wall mounting fixture
• 2 wall plugs and 2 screws
• Installation template
• Installation instructions
• Service instructions
• User instructions
• Warranty registration
Safety lifting advice
When handling or lifting the boiler body always use safe techniques - keep your back straight,
bend your knees, don’t twist - move your feet, avoid bending forwards and sideways and
keep the load as close to your body as possible. Always ensure that the lift weight is within
your own individual capability, if in doubt seek advice.
Where possible transport the boiler using a sack truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel where the weight is concentrated to,
establish the centre of gravity, repositioning yourself as necessary before carrying out the lift.
Vitoden 200-W installation 4/9/07 7:27 pm Page 33