Technical data

Vitorond 100, VR1-22 to -33 Installation and Service
5583 571 - 01
14
Boiler Set-up and Location
CAUTION
Boiler must be installed in such a way that oil ignition
system components are protected from water (spraying,
splashing, etc) during boiler system operation and service.
IMPORTANT
For important information concerning boiler placement
and set-up, refer to the section entitled “Mechanical
Room” on page 10.
The boiler should be located as close to the chimney as
possible. Set-up/locate boiler with slight incline towards
the rear of the boiler using levelling bolts A.
Set-up
Combustion Chamber Insert
For optimum, environmentally sound operation, Vitorond
boilers are equipped with a high-grade, corrosion resistant,
stainless steel combustion chamber insert.
Ensure the bolts of the combustion chamber door are
tightened before installing the burner.
Combustion chamber insert sizes
Boiler model No. VR1-22 VR1-27 VR1-33
a
b
in.
(mm)
in.
(mm)
9f
(244)
9
(231)
9f
(244)
9
(231)
9f
(244)
9
(231)