Installation Instructions
15
Filling the siphon with water
Fill the flue outlet with a minimum of
0.3 l of water.
!
Please note
At commissioning, flue gas may
be emitted from the condensate
drain.
Fill the siphon with water before
commissioning.
Flue and ventilation air connection
Connect the balanced flue.
During installation and positioning of the
flue system, observe building regula-
tions part L and BS 5440.
Flue system installation instruc-
tions.
Installation sequence
Fitting the boiler and making connections
(cont.)
5609 059 GB
Installation










