Technical data
Data sheet
General Terms of Delivery
KÖB Holzfeuerungen GmbH, Flotzbachstr. 33, A-6922 Wolfurt, Tel. +43/5574/6770-0, Fax 65707, E-Mail: office@kob.cc
Subject to technical changes
1000-1
2007-09-21_E
1) Liability on Orders of Confirmation,
Altering and Cancelling Orders
1.1) If no other agreement exists, the confirmation of order
determines the contents and the time of delivery. If
the technical specifications of individual parts deliv-
ered are not restated in the confirmation of order, then
the technical specifications stipulated in the last bid
are valid.
1.2) Should in addition to the confirmation of order, the
customer's order be valid, it is noted on the supplier's
confirmation of order according to priority.
1.3) If within 10 days of sending the confirmation of order,
no objection is raised, then the order is regarded as
accepted. With terms of deliveries of less than 30
days, the window for objections is narrowed to 30% of
the terms of delivery.
1.4) Altering and cancelling orders after the term of objec-
tion has expired, is only possible with the written con-
sent of the supplier. Any additional cost is to the
buyer's account.
2) Prices
2.1) The listed prices of the supplier (price lists) may be
changed at any time without prior notice.
2.2) The listed prices of the supplier are ex-factory prices
and do not include Value Added Taxes (VAT).
3) Illustrations, Properties and Technical Terms
All technical data, illustrations, measurements, dia-
grams and weights specified in bids, remain non-
binding until they are part of a binding documentation
delivered in connection with an order of confirmation.
All rights for construction related changes remain re-
served. Materials may be replaced by equivalent al-
ternatives.
4) Copyrights and Ownership of Technical
Drawings and Documentations
Technical drawings and documentation that are
handed to the buyer but do not form an integral part of
the equipment and its applications, remain the prop-
erty of the supplier. Only with the written consent of
the supplier, may documents be passed on to third
parties in a changed form or in the original form.
5) Copyrights and Ownership of
Control Programs
Control programs used to control the equipment re-
main the property of the supplier. With the full pay-
ment of the equipment, the buyer receives life-long,
unrestricted user rights to the control programs.
6) Terms of Delivery
6.1) Agreed upon terms of delivery are binding.
6.2) Equipment related preparations of the delivery site
must be made before delivery of the equipment. Clari-
fications on the dimensions of the site (to adapt
mountings and fittings of the equipment to the site, the
following minimum terms of delivery are required:
42 days for systems with standard components
70 days for portable building systems
Multiple-boiler systems (complex large-scale systems)
according to arrangement with the supplier.
Should it not be possible to make these preparations
within the stated minimum terms and should the sup-
plier not be at fault, then the supplier is relieved of all
liabilities of the term of delivery.
6.3) The supplier reserves the rights to hold back on the
delivery should the agreed terms of payment not be
met by the buyer.
6.4) Should any additional cost arise due to the delay in
delivery, a mutually acceptable settlement of the cost
to the buyer should be negotiated between the con-
tract partners.
6.5) Should ordered equipment not be accepted at the
agreed term of delivery, the supplier has the right to
invoice the equipment to the buyer. Any additional
cost arising from storage should be negotiated and
settled between the contract partners
6.6) With on demand orders, the supplier reserves the
right to only start with the production of the equipment
after the receipt of the on demand order.
7) Shipment /Transportation
7.1) The supplier uses the type of packaging materials and
means of transportation he deems suitable.
7.2) If no other agreement exists, the equipment is sold
ex-factory. Furthermore, the INCOTERMS of the day
of the contract signing is valid.
7.3) Should parts of the equipment be shipped individually
at the buyer's request, then the additional cost will be
to his account.
8) Installations by the Supplier
8.1) Has the mode of transportation and installation of the
equipment been agreed upon, then the buyer is obli-
gated to prepare the installation site on time and in
the manner stipulated. These required preparations
are listed in the confirmation of order under the posi-
tion "Installation".
8.2) In general, a paved pathway suited for trucks that
bring the equipment to the site must be prepared.
8.3) Furthermore, before installation starts, the masonry,
carpentry and other preparatory work has to be
moved along far enough so that upon delivery of the
equipment, the installation technicians can take up
their duties right away and carry them out without in-
terruptions.
8.4) Should installation have to be interrupted due to lack
of preparedness of masons, carpenters, etc. the buyer
then must properly store the uninstalled equipment
and protect it as if it was his own property
The cost arising from the delay and additional travel
expenses of the installation technicians are to the
buyer's account.
9) Inspection/Complaints during Handover
9.1) The buyer is obligated to inspect the goods immedi-
ately upon receipt.
Should the goods not correspond to the items on the
delivery note, or in case of visible damage to the de-
livered goods, the buyer has to mark it on the delivery