Technical data
4
Contents
1 General Information 6
1.1 State of the art 6
1.2 Documented information 6
2 Codes 6
2.1 Mechanical room 6
2.2 Working on the equipment 6
2.3 Technical literature 6
3 The structural Surroundings for the Furnace 7
3.1 Heating room requirements 7
3.2 The chimney connection 7
4 Transport and Installation 7
5 Water System Installation 8
5.1 Safety Equipment 8
5.2 Expansion 8
5.3 The boiler circuit with return circuit 3- way valve 8
5.4 The extinguishing water tank 8
6 Electrical Installation 9
6.1 Positioning the control cabinet 9
6.2 Electrical connection 9
7 Fire Protection 9
7.1 Protection against burn-back for the boiler plant 9
7.1.1 Preventing overfilling of the fire box 9
7.1.2 Preventing burn-back 9
7.1.3 The backflash safeguard (RZS) 9
7.1.4 Automatically Triggering Extinguishing System for the Furnace Feed (SLEK) 9
7.2 Burn-back safeguard for the fuel supply system (RSE) 10
7.2.1 Automatically Triggering System for the Material Supply System (SLE-M) 10
7.2.2 The slide valve 10
7.2.3 Rotary valve 10
7.2.4 Double rotary valve with pressure compensation system 10
7.3 Fire protection for the fuel storage space 10
8 Commissioning 10
8.1 Filling the heating system 10
8.2 Fuel for the commissioning 10
8.3 Inspection of the installation 11
8.4 Commissioning and handover 11