Install Instructions
Table Of Contents
- ProPress stainless approved fluids
- ProPress stainless approved gases
- Dimensional data
- ½" Stainless Steel, ASTM A312 flow rate, velocity, loss
- ¾" Stainless Steel, ASTM A312 flow rate, velocity, loss
- 1" Stainless Steel, ASTM A312 flow rate, velocity, loss
- 1¼" Stainless Steel, ASTM A312 flow rate, velocity, loss
- 1½" Stainless Steel, ASTM A312 flow rate, velocity, loss
- 2" Stainless Steel, ASTM A312 flow rate, velocity, loss
- 2½" Stainless Steel, ASTM A554 flow rate, velocity, loss
- 3" Stainless Steel, ASTM A554 flow rate, velocity, loss
- 4" Stainless Steel, ASTM A554 flow rate, velocity, loss
- Fitting friction loss equivalent length of tube (feet)
- MSS SP-58 or the maximum spacing and minimum rod sizes
- Minimum distance between press fittings
- ProPress standard jaws clearance requirements
- ProPress standard jaws clearance requirements between tube, wall, and floor
- ProPress compact jaws clearance requirements
- ProPress compact jaws clearance requirements between tube, wall, and floor
- ProPress rings dimensions
- ProPress rings with V1 actuator clearance requirements
- ProPress rings with V2 actuator clearance requirements
- ProPress rings with V1 actuator clearance requirements between tube, wall, and floor
- ProPress rings with V2 actuator clearance requirements between tube, wall, and floor
- ProPress rings with C1 actuator clearance requirements between tube, wall, and floor
- ProPress XL-C rings dimensions
- ProPress XL-C rings clearance requirements
- ProPress XL-C rings clearance requirements between tube, wall, and floor
- Minimum distance between existing soldered or brazed fitting and ProPress fitting
- Minimum distance between soldered fitting and ProPress fitting
- Minimum insertion depths for ProPress Stainless ½" to 2"
- Insertion depths for ProPress Stainless ½" to 2" no-stop couplings
- Minimum insertion depths ProPress Stainless 2½" to 4"
- Insertion depths for ProPress Stainless 2½" to 4" no-stop couplings
- About this Document
- Disclaimer
- Product Information
- Handling Instructions
- Installation Instructions
- Limited warranty
Product Information
17 of 56
IM-PP 599834 0320 ProPress Stainless
2.5 General Installation Requirements
The Viega ProPress Stainless tting system must be installed while
considering the following general industry requirements.
2.5.1 Required Tools
The following tools are required for making a press connection:
■ Pipe cutter or a ne-toothed hacksaw
■ Deburring tool
■ Marker for marking insertion depth on the tube
■ Press machine with constant pressing force
■ Press jaw or press ring with corresponding actuator suitable for the
tube diameter and with the proper prole
2.5.2 Expansion
Thermal expansion in installed systems generates stress on the tubing
and appliance connectors. Compensation must be allowed for expansion
and contraction that may occur within the system. Expansion joints or
mechanical expansion compensators may be used to alleviate these
stresses. ProPress Stainless systems do not require any additional
protection when compared to traditional joining methods.
The following methods are eective:
■ Fixed and sliding hangers
■ Expansion equalization joints (expansion bends)
■ Expansion compensators
Improper Tool/Material Damage
Only use press jaws and rings that are designed for use
with ProPress ttings.










