Install Instructions
Table Of Contents
- About this Document
- Disclaimers
- Product Information
- Viega Manifolds
- Viega PureFlow Tubing
- Viega PureFlow Fittings
- Viega PureFlow System Design Considerations
- Water Service Installation
- Installing the ManaBloc
- Mounting the ManaBloc
- Installing Manifold Distribution Lines
- Installing the Viega PureFlow PEX Tubing System
- Fastening the Viega PureFlow System
- Installing Viega PureFlow Fittings
- Pressure Testing Viega PureFlow Systems
- System Disinfection
- Installer Checklist
- Limited Warranty
Mounting the ManaBloc
49 of 88
IM-PF 724596 1021 PureFlow Water System (EN)
9.4 Mounting the MiniBloc
1. For proper bracket spacing, measure distance between the center
ribs of the rst and last MiniBloc modules. Mark this distance on the
selected mounted surface.
2. Align the outside edge of each bracket within each end mark.
Mounting brackets shall be mounted level and parallel to each other
before axing the MiniBloc manifold. NOTE: Use both mounting
brackets provided with each MiniBloc manifold. Ensure the mounting
surface is suitable to support the weight of the manifold and attached
tubing when lled with water.
3. Use two wood screws per bracket, 1" or longer, to prevent
misalignment.
4. Position bottom metal tie-rod into the bottom clip of the mounting
brackets then roll manifold toward top clip. The MiniBloc may be
mounted either vertically or horizontally.
5. Complete mounting by rmly pushing the MiniBloc toward the top
clip of the mounting brackets, which should spread and snap over top
metal tie-rod.
1
2 3
4
5
6
Horizontal
Mount
Vertical
Mount
Vertical
mount
Horizontal
mount
Horizontal
Mount
Vertical
Mount
Vertical
mount
Horizontal
mount