Instruction Manual

n if necessary, stacking element for bonded sealing model 4925
n Material for securing the drain
3.2 Assembly
3.2.1 Connecting the drain
The connection to the wastewater system must be completed before
the drain can be installed in the floor construction. Proceed as follows:
Requirements:
n A pipe to the planned drainage position is already in place for the
connection to the wastewater system.
n The drainpipe has an internal sealing lip.
Push the drain socket into the drainpipe completely.
3.2.2 Prepare for subsequent work
A few points must be observed to integrate the drain into the floor con‐
struction properly. For this reason, proceed as follows to prepare the
drain for subsequent work:
Requirements:
n The drain is connected.
Position the drain at the desired height at the place of use.
Depending on planning, the drain can be integrated into concrete,
screed or a heat insulation layer, for example. It is important that the
upper edge of the drain flange is flush with the upper edge of the
sealing layer. If necessary, raise or lower the drain in the existing
floor using suitable material.
Align drain horizontally using a spirit level.
Secure the drain in such a way that it cannot shift when the subse‐
quent works are applied.
Most importantly, it must be ensured that the drain does not float
when the concrete or screed is poured in.
Connecting to the wastewater system
Handling
Advantix bathroom drain 16 from 22