Instruction Manual

3 Handling
3.1 Assembly information
3.1.1 Important note
Before assembly:
n Check if the drainage capacity of the drain is sufficient for the arising
water volume
Ä
Chapter 2.2.3 „Drainage capacity“ on page 7.
n Check if the installation height of the drain corresponds with the
planned floor construction.
n Ensure that the required connection line is installed with the neces‐
sary incline to the planned installation location.
n If necessary, supply the required accessories
Ä
Chapter 2.5
„Required accessories“ on page 14.
During assembly:
n Observe installation dimensions.
n Decide whether or not a backflow seal is required in the insertion
part of the top.
After assembly:
n The drain flange must be fully lined with mortar.
3.1.2 Installation dimensions
Fig. 6: Dimensional drawing model 4936.3
3.1.3 Tools and materials
n if necessary, sealing collar, clamping ring, fitting screws
n Top with grate, if not included in scope of delivery
Ä
Chapter 2.3.1
„Overview“ on page 8
Required material
Handling
Advantix bathroom drain 15 from 22
https://tm.by
Интернет-магазин TM.by