Install Instructions
Table Of Contents
- About this Document
- Disclaimers
- Product Information
- Viega Manifolds
- Viega PureFlow Tubing
- Viega PureFlow Fittings
- Viega PureFlow System Design Considerations
- Water Service Installation
- Installing the ManaBloc
- Mounting the ManaBloc
- Installing Manifold Distribution Lines
- Installing the Viega PureFlow PEX Tubing System
- Fastening the Viega PureFlow System
- Installing Viega PureFlow Fittings
- Pressure Testing Viega PureFlow Systems
- System Disinfection
- Installer Checklist
- Limited Warranty
IM-PF 724596 1021 PureFlow Water System (EN)
Viega LLC
585 Interlocken Blvd.
Broomfield, CO 80021
Phone (800) 976-9819
www.viega.us
©2021, Viega
®
, ManaBloc
®
, MegaPress
®
, ProPress
®
, SeaPress
®
, Smart Connect
®
, Climate Mat
®
,
Climate Panel
®
, Climate Trak
®
, PureFlow
®
, XL
®
, XL-C
®
, and Viega: Connected in quality
®
are
trademarks of Viega Holding GmbH & Co. KG. Eco Brass
®
is a registered trademark of Mitsubishi
Shindoh Co., LTD. RIDGID
®
is a registered trademark of RIDGID, Inc. LoopCAD
®
is a registered
trademark of Avenir Software Inc. LEED
®
is a registered trademark of the U.S. Green Building Council
®
.