15.2 California Flushing Requirements
The State of California requires all installations of PEX piping, where it is
the initial plumbing system installed in new construction, shall be 󶈶ushed
twice over a period of at least one week. The piping system shall be 󶈵rst
󶈶ushed for at least 10 minutes and then 󶈵lled and allowed to stand for
no less than one week, after which all the branches of the piping system
must be 󶈶ushed long enough to fully empty the contained volume. This
shall not apply to installations of PEX pipe where it replaces an existing
tubing system of any material.
At the time of 󶈵ll, each 󶈵xture shall have a removable tag, shown below.
This new plumbing system was 󶈵rst 󶈵lled and 󶈶ushed on (date)
by
(name)
The State of California requires that the system be 󶈶ushed after standing at
least one week after the 󶈵ll date speci󶈵ed above. If this system is used earlier
than one week after the 󶈵ll date, the water must be allowed to run for at least
two minutes prior to use for human consumption.
This tag may not be removed prior to the completion of the required second
󶈶ushing, except by the building owner or occupant.