Install Instructions

IM-PR 566442 1114 (Design Manual)
6
Figure 1-1
Section through Climate Panel installation above subfloor with hardwood finish floor
Hardwood Flooring
Tubing Spacing
(per design)
Climate Panel:
Screw or staple Climate Panels to the
subfloor with 10 fasteners per panel.
Climate Panel should run perpendicular
to the direction of the hardwood floor.
¾" Plywood Subfloor:
The thickness of the plywood
subfloor should always be
installed in accordance with the
local building code.
Floor Joist
R-19 Insulation:
Refer to local code for
insulation requirements.
Figure 1-2
Section through Climate Trak installation with hardwood finish floor
Hardwood Flooring
NOTE:
Stop Trak installation
12" to 16" before bend.
¾" Plywood Subfloor:
The thickness of the plywood
subfloor should always be
installed in accordance with the
local building code.
Floor Joist:
Be sure to check with local building
codes to ensure no structural damage
will occur due to drilling joists.
Tubing Spacing
(per design)
Climate Trak: 3½" W x 48" or 96" L
have a 1" gap between Climate Traks,
install 1½" off the joist
R-19 Insulation:
Use a Foil Face or Radiant Barrier.
Keep a 1" to 2" air gap between
the insulation and the Traks.
Refer to local code for insulation
requirements.