Install Instructions

IM-PR 566442 1114 (Design Manual)
184
Step 1: Clearing the bays
If support crosses can be easily removed, take them out to clear bays for easier installation of the plates
and Traks. If crosses are unable to be removed, DO NOT drop tubing below them and resume on the other
side; install both plates and tubing above crosses so that no area is lost. Nails must be removed from
bays; cut them, grind them or carefully bend them over. Be careful not to damage the finished floor above.
(When cutting nails, be sure to wear safety glasses. )