Install Instructions

183
IM-PR 566442 1114 (Design Manual)
C.4 Installation
Before you start the installation, ensure that you have the proper tools for the job.
1. Staple gun with swivel connected hose (staples
7
16
" to ½" crown by ¾" to 1")
2. Compressor (1.5-2 hp)
3. Radial arm chop saw - for cutting Traks
4. Right-angle drill with bit kit (1¼") - for drilling joists
5. Palm hammer (medium plastic hammer tip)
6. Screw gun (¾" to 1" tech screws)
7. Nail grinder (4½")
• Installation (Power Tools) •
1. Tape measure (recommended 1 per person)
2. Heavy-duty nail cutter - for cleaning joists
3. Rubber mallet - for snapping tubing into Climate Traks
4. Decoiler
5. Hammer - for bending nails, miscellaneous
6. Chalk line - for chalking joists for hole or plate placement
7. Wrench - for manifold connections
8. Tubing cutter
9. Utility knives - for deburring and opening boxes
10. Caulking gun
• Installation (Hand Tools) •
1. Safety glasses (highly recommended)
2. Earplugs
3. Rolling scaffolding or sheet-rocker stilts or ladders
4. Lights (especially in basement applications)
5. Broom
• Miscellaneous •