Install Instructions
179
IM-PR 566442 1114 (Design Manual)
Figure C-1l
Section through heat transfer plate installation with tiles
Crack Isolation Membrane (optional)
NOTE:
Stop Heat Transfer Plate
installation 12" to 16" before
bend.
¾" Plywood
Subfloor:
The thickness
of the plywood
subfloor should
always be installed
in accordance with
the local building
code.
Floor Joist:
Be sure to check with local building codes to ensure no
structural damage will occur due to drilling joists.
Tubing Spacing
(per design)
Climate Trak:
5"W x 19"L have a 1" gap between Climate
Traks, install 1½" off the joist
R-19 Insulation:
Use a Foil Face or Radiant
Barrier to keep a 1" to 2" air
gap between the insulation
and the Traks.
Refer to
local code for insulation
requirements.
Tiles
Refer to TCNA installation
guidelines for underlayment
requirements.
Figure C-1m
Section through heat transfer plate installation with carpet
NOTE:
Stop Heat Transfer Plate
installation 12" to 16"
before bend.
3¾" Plywood
Subfloor:
The thickness
of the plywood
subfloor should
always be installed
in accordance with
the local building
code.
Floor Joist:
Be sure to check with local building codes to ensure
no structural damage will occur due to drilling joists.
Tubing Spacing
(per design)
Heat Transfer Plate:
5"W x 19"L have a 1" gap
between Climate Traks, install
1½" off the joist
R-19 Insulation:
Use a Foil Face or Radiant
Barrier to keep a 1" to 2" air
gap between the insulation
and the Traks.
Refer to
local code for insulation
requirements.
Carpet
Carpet Pad:
(suitable for radiant oor heating)