Install Instructions

IM-PR 566442 1114 (Design Manual)
176
Figure C-1g
Section through Climate Trak installation with linoleum or vinyl finish floor
Figure C-1f
Section through Climate Trak installation with carpet
NOTE:
Stop Trak installation
12" to 16" before
bend.
¾" Plywood
Subfloor:
The thickness
of the plywood
subfloor should
always be
installed in
accordance
with the local
building code.
Floor Joist:
Be sure to check with local building codes to ensure no
structural damage will occur due to drilling joists.
Tubing Spacing
(per design)
Climate Trak:
3½"W x 48" or 96"L have a 1"
gap between Climate Traks, install
1½" off the joist
R-19 Insulation:
Use a Foil Face or Radiant
Barrier to keep a 1" to 2" air
gap between the insulation
and the Traks. Refer to
local code for insulation
requirements.
Carpet
Carpet Pad
(suitable for radiant oor heating)
¾" Plywood
Subfloor:
The thickness of the
plywood subfloor
should always
be installed in
accordance with the
local building code.
NOTE:
Stop Trak installation
12" to 16" before bend.
Floor Joist:
Be sure to check with local building codes to ensure
no structural damage will occur due to drilling joists.
Tubing Spacing
(per design)
Climate Trak:
3½"W x 48" or 96"L have a 1" gap
between Climate Traks, install 1½"
off the joist
R-19 Insulation:
Use a Foil Face or Radiant
Barrier to keep a 1" to 2" air
gap between the insulation
and the Traks. Refer to
local code for insulation
requirements.
Linoleum or Vinyl Floor