IM-PR 566442 1114 (Design Manual)
Figure C-1d
Section through Climate Trak installation with hardwood finish floor
Hardwood
Flooring
NOTE:
Stop Trak installation
12" to 16" before bend.
¾" Plywood Subfloor:
The thickness of the plywood
subfloor should always be
installed in accordance with the
local building code.
Floor Joist:
Be sure to check with local building
codes to ensure no structural damage
will occur due to drilling joists.
Tubing Spacing
(per design)
R-19 Insulation:
Use a Foil Face or Radiant
Barrier to keep a 1" to 2" air gap
between the insulation and the
Traks. Refer to local code for
insulation requirements.
Climate Trak: 3½"W x 48" or 96"L
have a 1" gap between Climate
Traks, install 1½" off the joist
Figure C-1e
Section through Climate Trak installation with tiles
Crack Isolation Membrane (optional)
NOTE:
Stop Trak installation
12" - 16" before bend.
¾" Plywood Subfloor:
The thickness of the
plywood subfloor
should always be
installed in accordance
with the local building
code.
Floor Joist:
Be sure to check with local building codes to ensure no
structural damage will occur due to drilling joists.
Tubing Spacing
(per design)
Climate Trak:
3½"W x 48" or 96"L have a 1"
gap between Climate Traks,
install 1½" off the joist
R-19 Insulation:
Use a Foil Face or Radiant Barrier to keep a 1" to 2"
air gap between the insulation and the Traks. Refer to
local code for insulation requirements.
Tiles
Refer to TCNA installation
guidelines for underlayment
requirements