Install Instructions
151
IM-PR 566442 1114 (Design Manual)
Step 4:
Stagger the Climate Panels.
To begin ACP installation, cut an unopened bundle in half to create a straight edge to begin with. Be sure the
ACP is completely flush with the first row already fastened down before you begin to fasten the ACPs. After
the first row of ACPs has been laid out, begin to stagger seams.
Note: A 12" chop saw is a good
tool to use for cutting the Climate
Panels and ACPs.
Use ocut from 1st
row to start 2nd row
and so on
Always stagger Climate Panel
joints for both structural and
alignment purposes.
.