Install Instructions

149
IM-PR 566442 1114 (Design Manual)
Step 2:
Because most rooms are not perfectly square, lines need to be chalked to ensure proper layout of the
Climate Panels.
Begin by chalking a line along the wall where the first row of panels will be laid out. The line should be 7¼"
from the wall.
Next, chalk lines along the walls where the U-turn strips will be laid out. One way to ensure that the chalk
lines are perpendicular to each other is to use the right triangle rule (a
2
+b
2
=c
2
) also known as the 3, 4, 5
triangle.
4'
3'
Intersection
of chalked lines
must equal 5'
Snap chalk lines along the walls
with a distance of a U-turn strip;
width is 7" then add ¼"
Note:
Make sure oor is free of anything that
would inhibit the Climate Panels from
laying down at (screws, woodchips,
dried plaster, damaged plywood, etc.).
Mark out the area that
doesn’t require oor heating
such as kitchen cabinets.
This line is for the rst row
of Climate Panels. Make
sure the Climate Panels
are laid perpendicular to
the U-Turn Strips, which
may not be parallel with
the wall.