Install Instructions
IM-PR 566442 1114 (Design Manual)
148
Step 1:
Decide the proper direction of the Climate Panels.
Tile finish floor
If tiles will be installed over the Climate Panels, run the panels perpendicular to the floor joists. This stiffens
the floor for a more stable tile installation. Aligning the ends of each panel to lie on a joist is optional, but will
allow fasteners to attach panels, subfloor and joists together.
Carpet or vinyl finish floor
If the finish floor will be carpet, linoleum or vinyl, the direction of the Climate Panels is not critical.
Where possible, running the panels perpendicular to the floor joists will strengthen the floor and reduce
deflection.
Hardwood finish floor
Where hardwood flooring will be installed over the Climate Panel system, always run the panels
perpendicular to the direction of the hardwood planks (regardless of the joist direction). This will keep tubing
visible during floor nailing and reduce the possibility of accidental tubing puncture.
Tile application
In tile applications, install
Climate Panels perpendicular
to the floor joists. This
helps to stiffen the floor
and reduce deflection.
Carpet or vinyl application
In carpet applications, install
Climate Panels perpendicular
to the floor joists. This
helps to stiffen the floor
and reduce deflection.
Hardwood application
In hardwood applications,
always install Climate Panels
perpendicular to the direction
of the finish hardwood floor.