Install Instructions
145
IM-PR 566442 1114 (Design Manual)
Figure A-2k
Section through Climate Panel installation in wall
NOTE: Install Climate Panel
six rows high to avoid
interference with window
and picture placement.
Tubing Spacing (per design)
Climate Panel:
Screw Climate Panels to the studs
on both sides of groove.
R-19: Refer to local code for
insulation requirements.
Floor Joist
¾" Plywood Subfloor:
The thickness of the plywood
subfloor should always be
installed in accordance with the
local building code.
Wall Stud with Spacer Strip
Wall Insulation
Refer to local code for insulation
requirements.
Gypsum
Figure A-2l
Section through Climate Panel installation in wall
NOTE: Install Climate Panel
six rows high to avoid
interference with window
and picture placement.
Tubing Spacing (per design)
Climate Panel:
Screw Climate Panels to the studs
on both sides of groove.
R-19: Refer to local code for
insulation requirements.
Floor Joist
¾" Plywood Suboor:
The thickness of the plywood
suboor should always be
installed in accordance with the
local building code.
Wall Stud with Spacer Strip
Wall Insulation
Refer to local code for insulation
requirements.
Concrete Fiberboard (Refer
to crack isolation membrane
manufacture for additional
requirements.)
Crack Isolation
Membrane (optional)
Tiles