Install Instructions
IM-PR 566442 1114 (Design Manual)
144
Figure A-2i
Section through Climate Panel installation on existing slab with tiles
Figure A-2j
Section through Climate Panel installation on existing slab with linoleum or vinyl finish floor
¾" Plywood:
Stagger and fasten plywood to slab.
Tubing Spacing (per design)
Climate Panel:
Screw or staple Climate Panels
to the subfloor with 10 fasteners
per panel.
Polyethylene Film:
Cover level slab with 6 mil. (min.)
polyethylene film, overlap 4" to 6"
Compact Subgrade
Concrete Slab:
Slab must be level prior to
Climate Panel installation.
Tiles
Crack Isolation Membrane (Optional)
¼" to ⅜" Concrete Fiberboard: Glue and
screw concrete fiberboard to Climate
Panels. (Refer to crack isolation membrane
manufacturer for additional requirements.)
¾" Plywood:
Stagger and fasten plywood to slab.
Tubing Spacing (per design)
Climate Panel:
Screw or staple Climate Panels
to the subfloor with 10 fasteners
per panel.
Polyethylene Film:
Cover level slab with 6 mil. (min.)
polyethylene film, overlap 4" to 6"
Compact Subgrade
Concrete Slab:
Slab must be level prior to
Climate Panel installation.
Linoleum or Vinyl Floor
¼" to ⅜" Concrete Fiberboard: Glue and
screw concrete fiberboard to Climate Panels.