Install Instructions
143
IM-PR 566442 1114 (Design Manual)
Figure A-2g
Section through Climate Panel installation on existing slab with floating floor
Figure A-2h
Section through Climate Panel installation on existing slab with hardwood finish floor
Foam Pad
Tubing Spacing
(per design)
Compact Subgrade
Concrete Slab:
Slab must be level
prior to Climate
Panel installation.
Floating Flooring
Foam Pad
¾" Plywood:
Stagger and fasten plywood to
slab.
Tubing Spacing (per design)
Climate Panel:
Screw or staple Climate Panels to
the subfloor with 10 fasteners per
panel. Climate Panel should run
perpendicular to the direction of the
hardwood floor.
Polyethylene Film:
Cover level slab with 6 mil. (min.)
polyethylene film, overlap 4" to 6"
Compact Subgrade
Concrete Slab:
Slab must be level prior to
Climate Panel installation.
Hardwood Flooring