Install Instructions

IM-PR 566442 1114 (Design Manual)
138
Appendix B Repair Coupling Wrap
ViegaPEX
®
Repair Coupling Wrap
1 2 3 4
5 6 7
1. Press tting as per Viega’s PEX Press Product Instructions.
2. Remove Tool Locator Rings to ensure a proper seal.
3. Leaving protective film in place, measure amount of tape required for sealing fitting by wrapping
fitting completely.
4. Overlap by 1/2" to 1" to ensure proper seal
5. Cut required length of tape.
6. Carefully wrap tting with tape, removing protective lm as tting is wrapped.
7. Completely cover fitting. The silicone will bond within 2 minutes and create a permanent bond
within 24 hours.
NOTE: Concrete pour will not affect sealant’s bonding process.