Service manual

SM016
WIRING DIAGRAM - 2
Insert ECN1 (LVDS Cable)
in MAIN Board, EC01 first.
Main Board
NOTES:
1. This drawing shows connection
and wire styling.
2. This drawing shows the rear
view of the set.
3. Securely lock the lead holder
in place.
4. Cores and SK binders with ( )
round brackets should be
delivered integrated with
harness.
Slot Board
Filter Board
To L ED Board
To L ED Board
To S P
To S P
To Power Unit
To Power Unit
To Power Unit
To S P
To S P
To Control Board
To Control Board
PS Process
EFAC Preparation:
Secureyl insert Faston of EFAC in the
terminal of the inlet as follows:
To Power Unit
To Power Unit
To Power Unit
31
(For P50T01U, P50T01E, P50TP01U and P50TP01E)
P50T01U/E P50TP01U/E