Specifications
LENEL
®
- A UTC FIRE & SECURITY COMPANY FACILITY COMMANDER™ v2.2.3 GUIDE SPECIFICATIONS
[PROJECT NUMBER]
[DATE]
[PROJECT NAME]
[PROJECT LOCATION]
[AUTHOR]
[FILE NAME]
INTEGRATED AUTOMATION INSTRUMENTATION & TERMINAL
DEVICES FOR ELECTRONIC SAFETY & SECURITY SYSTEMS
25 38 00 - 20
LENEL CONFIDENTIAL INFORMATION – For use by Lenel-authorized VARs, prospective or existing Facility Commander users
and their respective authorized consultants. All other third-party use is prohibited without Lenel’s written permission.
1. Development of maps shall include the creation of icons for all doors, monitor points, and
tamper circuits.
2. Owner shall provide AutoCAD .DWG or .DXF file floor plan drawings as the basis for the
creation of maps.
D. Owner, with the cooperation and assistance of contractor, will input the cardholder data for each
access card.
E. Maintain hard copy worksheets which fully document the system program and configuration.
1. Worksheets shall be kept up to date on a daily basis until final acceptance by Owner.
2. Worksheets shall be subject to inspection and approval by Owner.
3. Provide final copies to Owner prior to project close-out.
F. Maintain a complete, up-to-date backup of the system configuration and cardholder database.
1. Backup shall be maintained throughout programming period until final acceptance by
Owner.
2. Submit back-up media to Owner upon Final Acceptance.
G. Provide follow-up assistance with system configuration sixty (60) days after start-up of system as
requested by Owner. Include a labor allowance for follow-up assistance in base bid price.
3.7 CLOSEOUT ACTIVITIES
A. Commissioning
1. Place entire system into full and proper operation as designed and specified.
2. Verify that all hardware components are properly installed, connected, communicating,
and operating correctly.
3. Verify that all system software is installed, configured, and complies with specified
functional requirements.
4. Perform final acceptance testing in the presence of Owner’s Representative, executing a
point by point inspection against a documented test plan that demonstrates compliance
with system requirements as designed and specified.
5. Submit documented test plan to Owner at least (14) days in advance of acceptance test,
inspection and check-off.
6. Conduct final acceptance tests in presence of Owner’s Representative, verifying that each
device point and sequence is operating correctly and properly reporting back to control
panel and control center.
7. Acceptance by Owner is contingent on successful completion of check-off; if check-off is
not completed due to additional work required, re-schedule and perform complete check-
off until complete in one pass, unless portions of system can be verified as not adversely
affected by additional work.
8. System shall not be considered accepted until all acceptance test items have been
successfully checked-off. Beneficial use of part or all of the system shall not be
considered as acceptance.
B. Training
1. Provide system operations, administration, and maintenance training by factory trained
personnel qualified to instruct.
a. Training shall be oriented to the specific system being installed under this contract
as designed and specified.
b. Provide training sessions at Owner’s facility, and schedule at the Owner’s
convenience.
c. Provide written training outline and agenda for each training session prior to
scheduling.
d. Record and provide copies of training programs for Owner knowledgebase.
2. Owner will designate personnel to be trained.
a. Provide classroom instruction for people selected by Owner.
b. Provide two (2) hours of individual hands-on training for each person.