Specifications

LENEL
®
- A UTC FIRE & SECURITY COMPANY FACILITY COMMANDER™ v2.2.3 GUIDE SPECIFICATIONS
[PROJECT NUMBER]
[DATE]
[PROJECT NAME]
[PROJECT LOCATION]
[AUTHOR]
[FILE NAME]
INTEGRATED AUTOMATION INSTRUMENTATION & TERMINAL
DEVICES FOR ELECTRONIC SAFETY & SECURITY SYSTEMS
25 38 00 - 18
LENEL CONFIDENTIAL INFORMATION For use by Lenel-authorized VARs, prospective or existing Facility Commander users
and their respective authorized consultants. All other third-party use is prohibited without Lenel’s written permission.
PART 3 EXECUTION
3.1 INSTALLERS
A. Contractor requirements:
1. Factory authorized representative for no less than two (2) years, recognized by the
manufacturer of the specified system
2. Local installation and service organization
3. Provide three (3) references (minimum) whose systems are of similar complexity
a. Installed by this contractor in the last five (5) years
b. Presently maintained by the this contractor
4. Provide satisfactory evidence of liability insurance and Workmen's Compensation
coverage for employed personnel as required by law
B. Assure that all personnel working on the project are registered with the state or local jurisdiction
licensing board as provided for by current state/municipal statutes.
1. At time of bid, the contractor shall be licensed by the state or local jurisdiction to perform
security work within the state.
2. Contractors who have security licenses or permits pending shall not be considered
acceptable for bidding on this project.
C. Installer and technician requirements:
1. Must be experienced and qualified to accomplish all work promptly and satisfactorily.
2. Provide proof that designated service and support personnel have successfully completed
the appropriate manufacturer offered hardware and software training and certification for
installation, service and maintenance of the specified system.
3. Advise Owner in writing of all designated service and support personnel responsible for
installation as well as pre and post warranty service.
3.2 EXAMINATION
A. Inspect the installation site prior to bidding the job.
B. Report any discrepancies between the project specification and bid documents and the site
examination prior to the bid opening date.
3.3 PREPARATION
A. Order all required parts and equipment upon notification of award.
B. Bench test all equipment prior to delivery to the job site.
C. Verify the availability of power where required. If a new source of power is required, a licensed
electrician shall be used to install it.
D. Verify the availability of communication infrastructure where required.
E. Arrange for obtaining all programming information including access times, free access times,
door groups, operator levels, etc.
3.4 INSTALLATION
A. Requirements
1. Install all system components and appurtenances in accordance with the manufacturer’s
specifications, referenced practices, guidelines, and applicable codes.
2. Furnish all necessary interconnections, services, and adjustments required for a complete
and operable system as specified.