User manual

2. Fix the ceiling mount base
1. Drill a hole in the ceiling to pass the cables
through, and then fix the ceiling mount base
using suitable fixings.
4. Fix the main speed dome module to the
base using the four security screws.
5. If using any optional brackets (wall mount, flush mount or pendant mount), the ceiling mount base
supplied with the speed dome is not required and should not be used.
3. If required, connect alarm inputs and the
relay according to the above diagram. GND
and 12V can be taken from the speed dome
power supply.
2. Make cable connections to the speed dome
base for 12V DC power, video and RS-485
telemetry.
3. Verify basic operation
1. After carefully checking the installation and
all cable connections, apply power to the
speed dome and check that the startup and
self test screen is displayed.
2. After the self test is complete, the speed
dome starts normal operation. Verify that there
is basic PTZ control from your control
equipment.
CONCEPT PRO SPEED DOME
------------------------
FIRMWARE VER
COLOUR SYSTEM
PROTOCOL
BAUD RATE
ADDRESS
DATA MEMORY
ZOOM MODULE
HOME TEACHING..
C 40
325/37/x1/NW
: 2.030V
: PAL
: PELCO-D
: 2400
: 1
: OK
: OK
OK
07/JAN/2007
14:46:46
CAM 1
If there’s a problem at this stage...
…work through the logical steps below to determine and rectify the problem
No picture - Check that the PSU is correctly connected and has power. If you have a test meter,
verify that the output of the PSU is 12V DC.
If the PSU is OK, check the BNC crimp connection is correctly made at both the speed dome end
and the DVR / monitor / matrix end. A portable test monitor connected directly to the video output of
the speed dome is also a useful test - if a picture is displayed, double check the BNC connections
and the signal cable used.
No PTZ control - check that the control equipment you are using is compatible with the speed
dome and is configured to match the speed dome settings correctly.
If dip switches were changed on the speed dome, check the power on self test screen to ensure
that protocol, ID and baud rate are as expected.
If the settings match, you should check the polarity of the connections, both on the control
equipment and the speed dome. If you suspect there is a polarity issue, swap the A & B wires at the
speed dome to see if this resolves the problem.
Check also that there are no other telemetry devices on the system with the same ID as the speed
dome. If in doubt, connect the speed dome directly to the PTZ controller and isolate all other
equipment.
OUT
External detector
volt free contacts
External
power
source
Relay output max
125V AC @ 0.5A or
30V DC @ 1A
GND
12V
2
1
COM
4