Operation Manual

v
Quick Start Step-by-Step Checklist
1 Read all Safety Warnings And Cautions ...................... i
2 Choosing an appropriate location ............................ 14
3 Unpack and save shipping materials ........................ 15
4 Install the feet ........................................................... 15
5 Look for Instapak Warning Sheet ............................. 15
6 Assess water quality & decide on water source ..... 16
7 Set up and install the drip tray .................................. 19
8 Adjust the reservoir platform for reservoir use ......... 22
9 Set water switch to reservoir position ....................... 22
10 Verify that low-water switch operates properly ........ 22
11 Prime the rotary pump ............................................. 24
12 Fill brew boiler ........................................................ 24
13 Test brew system for proper water flow ................... 25
14 Allow brew boiler to heat up ................................... 25
15 Fill steam boiler ....................................................... 25
16 Allow steam boiler to heat up .................................. 25
17 Test hot water and steam output .............................. 26
WARNING: Not properly setting up, starting up, or using the Double Domobar properly can result
in damage to the machine, bodily injury, or property damage. Damage due to improper setup or
use is not covered by the warranty. We highly recommend reading through this manual in its
entirety before plugging the Double Domobar into an outlet or attempting to connect the ma-
chine to an external water source. This checklist is supplied as a convenience only. It is your
responsibility to assure that the details of each step below is properly followed as detailed in
this owners manual.
PAGE
This “Quick-Start” checklist is not meant to replace a thorough understanding of the process of preparing
and using your Vibiemme Double Domobar, nor can it be used as a definitive set of instructions for set up and
use. It is supplied only to help you verify that you have followed the necessary steps to set up and initially start
the Vibiemme Double Domobar.
CONTINUE BELOW FOR PLUMBED WATER OPTION ONLY:
18 Set water switch for plumbed option ....................... 27
19 Defeat reservoir water level safety switch ............... 28
20 Connect plumbed water supply hose ....................... 28
21 Test plumbed supply ............................................... 29
22 Brew boiler ............................................................. 30
23 Steam boiler ............................................................. 30