Operation Manual

6
Pressure Builds
14 The infusion valve is pushed open by the pressure of
the incoming water (direction of flow indicated by the
blue arrows). The space below the infusion valve begins
to fill with water. During the time it takes to fill this void,
the pressure in the entire brew path cannot exceed that
which is determined by the force of the spring which
normally holds this valve in the closed position. This
water at low pressure is pre-wetting (“infusing”) the cof-
fee at this time.
15 The exhaust valve at the bottom of the group is held by
a much stiffer spring which exerts a force greater than
the brewing pressure. This valve will remain closed, as
seen here, until the user lowers the lever back to the ful-
ly-down, “at rest” position.
16 Once the infusion chamber is completely filled, the en-
tire brew path reaches the maximum brewing force from
the pump. This increase in pressure will be obvious if
you are watching the brew pressure gauge.
17 When that equilibrium in pressure is achieved, the in-
fusion valve will close, and it will stay in that closed
position for most of the extraction process, as long as the
pressure above and below that valve are equal.
18 Pressure also builds over the coffee at this time, and
now the extraction begins in earnest.
15
14
16
17
18