Specifications

SurfBeam
®
2 Satellite Modem Outdoor Unit (ODU)
Installation Guide
3-8 1104460 Rev. 001
Now run the ground wire from the TRIA connection marked GND to the ground lug (Figure
3-7) on the Elevation Plate (Figure XX) along the boom arm. Wrap the ground wire and boom
arm with UV resistant cable ties.
Figure 3-7. Attaching Ground Wire to TRIA.