Specifications

SurfBeam
®
2 Satellite Modem Outdoor Unit (ODU)
Installation Guide
Rev. 001 1104460 2-9
Now run the ground wire from the TRIA connection marked GND to the ground lug (Figure
2-8) on the Elevation Plate (Figure 2-9) along the boom arm. Wrap the ground wire and boom
arm with UV resistant cable ties, as shown in Figure 2-9.
Figure 2-8. Attaching Ground Wire to TRIA.