ASSEMBLY AND INSTALLATION OF
DOUBLE WALL CHIMNEY SYSTEM
Eachdoublewallchimneysectionconsists
ofagalvanizedouterpipe,astainlesssteel
inneruepipeandawirespacer.Pipesec-
tionsmustbeassembledindependentlyas
chimneyisinstalled.Whenconnectingchim-
neydirectlytoreplace,inneruepipesec-
tionmustbeinstalledrstwithlancedside
up.Outerpipesectioncanthenbeinstalled
overuepipesectionwithhemmedendup.
Pressdownoneachpipesectionuntillances
securely engage hem on replace starter.
Wire will assure proper spacing between
innerandouterpipesections.
Note: For Canada, use chimney parts des-
ignated HT.
Opening in collar around
chimney at top of replace must
not be obstructed. Never use
blown insulation to ll chimney
enclosure.
Continue to assemble chimney sections as
outlined, making sure that both inner and
outerpipesectionsarelockedtogether.When
installingdoublewallsnap-lockchimneyto-
gether,itisimportanttoassurejointbetween
chimneysectionsislocked.Checkbypulling
chimneyupwardafterlocking.Chimneywill
not come apart if properly locked. It is not
necessarytoaddscrewstokeepchimneyto-
gether(exception-seeFigure11,page9).
USING ELBOW OFFSETS (30E-8DM)
1. Toachievedesiredoffset,youmayinstall
combinations of 12", 18", 24", 36" and
48"lengthofdoublewallpipe(seeoffset
chart,page7,andFigure9).
Note: For systems with 2 elbow sets, mini-
mum height is 22 feet. Maximum height
for any system is 50 feet.
2. Chimney weight above offset rests on
return elbow. Straps must be securely
nailedtoraftersorjoists(seeFigure10,
detailsAandB,page9).
3. Maximumlengthofpipebetweensupports
(returnelbowor12S-8DM)is6'ofangle
run.Maximumoftwo6'anglerunsections
perchimneysystem(seeFigure9).
4. Allpipeconnectionsbetweenoffsetand
returnmustbesecuredwithtwoscrews
onouterpipeonly(seeFigure11,page
9).Donotpenetrateinnerstainless.