Use and Care Manual

Table Of Contents
3
2
Transportation and storage:
Attention:
Installation diagram of setting the film:
Cleaning and maintain:
1)Installation diagram of setting the film which was shown on the body of
machine
1.Cut off the power before placing film, and taking care of the winding direction
of film that was shown as yellow sticker.
2.Please check whether the Flower-type plastic splint is well connected
with the film or not.
3.After setting the film, please taped the film on the paper cylinder.
2) Operating steps
1.Plug in the machine, turn on the switch of power and choose the specified
temperature, the green lamp will be on in the mean time, which means the heating
tube is working. When the lamp turn to yellow, it means the setting temperature
was reached. Then constant temperature device makes sure the temperature inside
the case is within the designated level by stopping and restarting the heating
tubes' working circularly.
2.Set the cup in the lower mould and push it to the prescribed place. The upper
mould will be pressed for sealing automatically, and then the film will be ready
for next use.
3.Pull the cup out of the lower mould and repeat the action's of step 2.
Operation
1. The appliance must be connected with qualified ground wire.
2. Whenever the machine breaks down, please turn off the power and check if
any abnormal occurred, stop immediately for overhaul and maintenance.
3. The actual voltage should be the same as or within the range of 5% on either
side of voltage marked on the parameter sticker.
4. Never put your hand into the machine when it working.
5. Please confirm that when used by film has the color patches, the firm has
been placed in the notch. If not correct use, the motor will out of control.
6. If the motor can not operate with the light color of the patches, please adjust
the potentiometer of electric eye to improve the sensibility.
Please handle the appliance with care and avoid any violent vibration, collision or
inversion. The places for storage should have good ventilation and no corrosive
gas. Long-time Open-air storage is not encouraged, if it is inevitable, measures
should be taken to protect the machine from rain and blazing sun.
1.Before clearing, cut off the electricity and please use dry cloth to clean the
surface of machine, bottom of plate and fixed axle.
2.Please put grease on the bearings and moving parts of the machine to make it
turn more easily.
3.The way of cleaning serrated knife: please plug up the leak on the lower mould
and pour boiling water into the mould. Then push it to the prescribed place,
pressthe handle downward to the maximum extent possible and keep for a few
minutes,repeat the action circularly.
Our machines can seal disposable paper cups as well, please
be sure to useexclusive paper cup and paper-plastic films.
*
Sealing time controller
4. The sealing time controler set up on the Panel , the user can adjust the
sealing dwell time according to the situation, the range of time adjusting:
0.1~3seconds.