Standard Box+240Box+170Box NEED HELP? CONTACT US! Have product questions? Need technical support? Please feel free to contact us: 53 This is the original instruction,Please read all manual instructions carefully before operating. TREVOR reserves clear interpretation of our user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if there Is any technology or software updates on our product.
NOTES: 1.Try to choose hard ground for installation. 2. Prepare Installation tools In advance(Rubber hammer and wood). 3. Carefully read this installation manual and confirm the quantity of accessories according to the list.
E2170 F1240 F2170 Frame barbaric) Foundation sheetlike) Foundation sheetlike) G Handlebar) H Setscrew) | Window pane(x&) J Sal-tapping screw's} K Small plankton) L Top Coverage} M Inner N Bottom Boardroom} 0 Queen Exclude) P Entrance Reducer) 240 BOX Installation of 240 box Step 1: Take two pieces of A1 and two pieces of B1 respectively, and connect them with a rubber hammer (note that it is not allowed to knock them directly, but put a board or cardboard on them and knock them in evenly}.
Il. Installation of 240 frame Step 1: Take 2 pieces of E1 and 1 piece of C, insert them into the card slot to connect them, then take 1 piece of F1 and insert it into the slot, and finally take 1 piece of D and insert it into the slot to complete a set of 240 frames. Step 2: Connect with nails at a/b/c/d 4 positions.
IIL. Installation of bee window Step 1: Take G, H and | to assemble the cover plate. Step 2: Take J and K to assemble the window pressing plates on both sides and put 10 sets of foundations and frames into the box.
170 BOX Installation of 170 box Step 1: Take two pieces of A2 and two pieces of B2 respectively, and connect them with a rubber hammer (note that it is not allowed to knock them directly, but put a board or cardboard on them and knock them in evenly). IL.
Step 2: Connect with nails at a/b/c/d 4 positions ( Please prepare connecting balls by yourself). IL. Installation of the window Step 1: Take G, H and | to assemble the cover plate. Step 2: Take J and K to assemble the window pressing plates on both sides and put 10 sets of foundations and frames Into the box.
Finally, please assemble according to the following figure: 1. Entrance Reducer 2. Bottom Board 3.240 Box 4. Queen Exclude 6.170 Box &. Inner Cover 7. Top Cover 1 Please use beeswax regularly for maintenance. 2 Close the bee window in cold, rainy, and windy weather. Manufacturer: Anshan July Environmental Protection Packaging Materials Co, Ltd Address: Room 301, Building 1, No.