Use and Care Manual

6. Adjust the length of the Veical Post to the desired distance from the ceiling.
Ensure the lower section of the veical post is placed on the inside of the two post
pieces. All posts are adjusted to the exact same length.
Secure the post together using 2pcs Hex Bolt M8x16, 2pcs Hex Nut and 4pcs
Washer. Make sure one bolt and nut assembly on each face of the veical posts. ( As
following drawing B)
Repeat this step for the remaining posts.
Using a single Hex Bolt M8X16 with 2 pcs Washers (one on each
side ) and lpc Hex Nut, connect the rst veical post assembly to
the ceiling bracket that was installed in the previous step.
Notes:
*For now, leave the veical posts slight loose on the ceiling
bracket so that they can move back and foh during the next
step. They will be tightened down in the upcoming steps.
*When installing the veical posts to ceiling brackets that are in
line, ensure that the veical posts are in-line, ensure that the
veical posts are 48" or 96" apa (depending on the orientation
of the rack)
10