Use and Care Manual
08
3. Next, align the two ends of the last long beam positioning paper with the edge of
the sho beam positioning paper respectively, and stick it on the ceiling parallel to
the rst long beam positioning paper.
Ceiling drilling positioning paper: rst stick the positioning paper on the appropriate position of the ceiling
(diagram shown at right),and then drill holes according to the marked position and requirements.
① ② ③ ④
Drill 2 holes on the black line, making sure they are on either side of the red line
Align the outside of the column with the red line
Drill 2 holes on the black line, making sure they are on either side of the red line
Align the outside of the column with the red line
Ceiling drilling positioning paper: rst stick the positioning paper on the appropriate position of the ceiling
(diagram shown at right),and then drill holes according to the marked position and requirements.
① ② ③ ④
Drill 2 holes on the black line, making sure they are on either side of the red line
Align the outside of the column with the red line
Drill 2 holes on the black line, making sure they are on either side of the red line
Align the outside of the column with the red line