Use and Care Manual

11. Take the Wire Decking unit and place them on the rack one by one.
*Look at the ceiling brackets and Lag screws to make sure that they have not pulled
out during the beam seating process.
If they have, it is an indication that the Lag screws may not be in the center of the
ceiling joist, or that they were not fully tightened when installed.
*Finally, check all the Nut and bolt connections on the veical posts and ceiling
brackets to ensure that evething is tight.
*Congratulations! You are now ready to load your rack and enjoy the extra space
that you have created.
15
B
B
B
A
A
B