Instructions / Assembly

- 2 -
NOTES
1. The work may have burrs that injure the hands. Please wear gloves before installation.
2. Check whether the parts are complete before installation.
3. Please read this manual carefully before assembly.
-Tools supplied:
-Tools required: + or
-Assembly time: About 1-2 hours (with 2 people)
MODEL AND PARAMETERS
Dome Roof(6m)
L600*W300*H200cm
67.5*170cm
Steel (Plastic impregnation), Φ0.9mm
Galvanized steel pipe, Φ25*0.8mm
ASSEMBLY
Mark
Picture
QTY
1
1450mm
4
2A
1500mm
15
2B
450mm
15
3
1050mm
8