Product Manual

4
LOW CEILING JIB CRANE IS SHIPPED IN 2 SECTIONS,
FRAME ASSEMBLY & PIVOT BRACKETS
1) Drill holes at desired height on a steel column using the
dimensions as shown. Make sure that the holes are centered
on the column.
2) Bolt the mounting brackets to the column with suitable
fasteners.
WALL JIB (FOR LOW CEILINGS)
Model JIB-LC-3-92, JIB-LC-6-92, JIB-LC-10-92 & JIB-LC-20-92
WARNING! This equipment
is not designed for and
should not be supporting or
transporting personnel.
LOW CEILING JIB CRANE IS SHIPPED IN 2 SECTIONS,
FRAME ASSEMBLY & PIVOT BRACKETS
1) After brackets are mounted, (28-126-012) place thrust
bearing (A) under bearing boss (B).
2) Align bearing boss (B) with the holes inside the mounting
bracket (C) on the column.
3) Place rod (D) through the holes of the mounting bracket
and the bearing boss (B).
4) Place 1-1/8 flat washers (E) on both ends of the rod (D).
5) Tighten both ends of the rod with 1-1/8" nuts (F), be sure
that there is even amount of threads on both ends of the rod
(D). Allow a 1/4" gap between.
6) Repeat steps 1-5 for the bottom assembly.
7) Shim between pivot bracket and mounting beam to level jib
boom.
1-11/16"
1-11/16"
2
CENTER
50-1/4"
COLUMN
13/16" DRILL
THROUGH 1ST
FLANGE 12 PLACES
2
2
2
C
FRAME ASSEMBLY
PIVOT
BRACKETS
D
E
F
A
B