Installation guide
DECT Installation 6-3
Chapter 6: DECT Installation
MBX IP Hardware & Installation Guide
DECT Installation
For detailed instructions on Site Planning for Base Stations, Cell-coverage Region Survey,
RSSI Monitoring, and Base Station Installation, refer to the DECT Installation Guide.
Board Installation
In the MBX IP system, WTIB4 and WTIB8 are both Base Station interface boards. The MBX IP
System can have up to two (with MPB100) or three (with MPB300) WTIB4 (up to 4 ports) or
WTIB8 (up to 8 ports).
WTIB4/WTIB8
The WTIB4/8 can be installed on universal slot 1-6 of any KSU except slot 1 of 1st KSU
and should be installed on the same KSU when installing more than one WTIB4/8.
CAUTION: - Prior to installing the WTIB4/8 System power should be turned OFF, to avoid
any damage.
- If the WTIB4/8 is plugged back into the System after being removed, the
WTIB4/8 should be plugged into the original slot to avoid the loss of
programmed data.
T
h
i
s
fe
a
t
u
re
i
s
n
o
t
av
a
i
l
a
b
l
e
a
t
t
h
i
s
t
i
m
e
.
.
.
Release 1.7
April 2012