Specifications
- 47 -
DX-120 Installation and Maintenance Manual INSTALLING THE DX-120
NO MDF
IMPORTANT!
Although this method initially appears to be convenient and more cost-effective, thre is an
inherent lack of serviceability. Therefore, Vertical does not recommend this method of installation.
Since the Vertical DX-120 is equipped with RJ-11 interfaces for all port connections*, it is possible to route station
cables into the KSU directly without use of 66M1-50 connector blocks. Using quality modular connectors and
crimping tool, connect each terminal cable directly to the port required.
Regardless of the method used, route the station / MDF cables out of the KSU through the opening at the lower left
of the KSU housing. A cable restraint clamp is provided which you can use to secure cables exiting the KSU.
*This does not include DPM16.
cable restraint
clamp