Programming instructions

PROGRAMMING VIA PC-DATABASE ADMINISTRATION (PC-DBA) DX-120 Programming Manual
- 22 -
Initializing the System (continued)
PERFORMING A COLD START
Use Software COLD Start to cause the system to restart operations and reload default customer database data.
CAUTION
USE THIS FEATURE WITH CARE!
This operation requires confirmation since all calls in progress will be
disconnected and the current database will be erased!
NOTE
Once you run this operation, connection between the switch and PC-DBA will be lost.
Therefore, you will have to re-connect to the switch.
After you connect the PC-DBA to the switch:
From the main PC-DBA Screen:
1) Go to MaintenanceXRemote ControlXSoftware Cold Start to display a prompt warning you about what
will happen if you continue with this process (i.e. programming operations will be lost, then returned to
default settings).
2) Click Yes to execute the Cold Start.
• A message will appear to confirm that a cold start was successfully completed.
OR
Click No to cancel the Cold Start and close the warning prompt.
3) Click OK to close the window.
HINT
Also refer to the Vertical DX-120 Installation and Maintenance Manual which can be
found on the Vertical CCC website (www.vertical.com/service-login.html).