Installation manual

2.0 RECEIVING THE COOLER
2.1 Unpacking (All Models)
The PureWaterCooler™ is shipped completely assembled and ready to operate.
Remove the top of the box and slide the PureWaterCooler™ out and save the box and
packing materials.
2.2 Inspection
Inspect the cooler for shipping damage. Look at the exterior panels to see if they
have been dented or damaged. Check the dispensing spigots in the front. Open the
bottom panel to assure that the filter system is intact. For Model 2000 only look
below the filter assembly in the back to see if the compressor is secure and has not
broken from the mounting. Inspect filter system to see that nothing is damaged or dis-
lodged from shipping.
3.0 Description (Model 2000 and 3000)
3.1 Description
The assembly drawing is shown in Figure 1. The Model 2000/3000
PureWaterCooler™ has 3 tanks There is a main holding water tank with float valve mech-
anism which controls a solenoid valve on the water feed line to maintain a constant level
of filtered water. There is a separate hot tank with internal heaters and a cold tank, cooled
by external coils. The hot tank is at the top level of the cooler, and has a vent hole to per-
mit hot water vapors to exit. The cold tank is lower inside the cabinet. Both tanks are fed
by gravity from the main holding tank. The controls for the cooler are on the front panel
as shown in Figure 1.
– 3–