User's Manual

Hardware and Wiring Installation Guide 55
6.3 Final Verification
Final verification and sign off for: ___________________________________________
Primary responsible party: _____________________ ________________________
(Name) (Signature)
PO Verification
Check
1. The hardware components: Collectors _______, Ethernet Concentrator
____, Sensors & Wiring ______ and computer(s) _______have been
installed and are acceptable
2. Training on backup procedures and preventive maintenance including
battery replacement has occurred to appropriate responsible party (see
below # 7)
3. Software CD has been issued and installed and clients are acceptable
4. Software & Hardware documentation have been issued and explained
5. Support & Troubleshooting have been covered (see #6 below)
6. Training has occurred to appropriate personnel and everyone is aware of their
current responsibilities:
_________________________________ _____________________________
(Primary Responsible Party) (Signature)
7. Customer’s Designated Support Contacts
a. System administrator: ____________________ ____________ ___________
(Name & Title) (Phone #) (E-mail)
b. Support contact: ________________________ ___________ ___________
(Name & Title) (Phone #) (E-mail)
8. The Versus System is working correctly according to contractual agreement
__________________________ __________________________ ___________
(System Administrator) (Signature) (Date)
__________________________ __________________________ ___________
(Primary Responsible Party) (Signature) (Date)
__________________________ __________________________ ___________
(Versus Representative) (Signature) (Date)