User's Manual

Hardware and Wiring Installation Guide 49
6.2 Installation Plan
Customer Name:
Customer PO #(s): ______________________________________________________________
Sensors:________________________________RF Sensors: ____________________________
Collectors:_________________________________________ Room & Location Names Required
Ethernet Concentrators: _________________________________________ IP Address Required
Badges: __________ Qty: _______ ; __________ Qty: _______ ; ____________ Qty: _______
Software:______________________________________________________________________
_____________________________________________________________________________
Additional Information: (i.e. badge drawer, focused sensors, relays…these require additional time)
Time Estimates:
1. # of installation days by contractor: ______
2. # of verification days by Versus Technology ______ * crew size of ___ _______
3. # of training hours ______ * crew size of ___ _______
4. # of on-site configuration ______ * crew size of ___ _______
5. Total Versus Installation _______
Required: PO, Install Checklist, and Proposal/Quote
Floorplan(s): Sensor Placement Drawings
Installation: Begin Date___/___/____ End Date ___/___/___
Requirements for Installation:
Room Keys
ID Badges
Support Contacts/Personnel w/phone #s
1.
2.
3.
Installer company and contact name:________________________________________________
(Versus or outside contracting familiar with regulations)
Floorplan(s) to Installers with Wiring Specification and if needed site visit
Hardware and Wiring Installation Manual
Wiring Specifications
Component List
Punch-down Block Wiring List
Communication Room Checklist
Relay Board Organization List
Sensors, collectors, concentrators, wiring installed and mounted correctly
Required facility sign off of contractors work
Versus verification of installation work
Communication Room Check List
Floorplans
Punchdown Block Wiring
Relay Board Organization
Installation Plan page 1 of 3