User's Manual
Preventative Maintenance Inspection Report
Customer ____________________________ Customer Number______________________ Date___________
Call Number______________________________
Equipment Serial Number________________ Software Revision _________
Configuration (ü)
___ Host Computer Setup ___ Collector Setup ___ Software Intellimotion 3-Pack
___ Pager Computer Setup
(Optional)
___ Punch-down Block
Configuration
___ Software Pager (Optional)
___ Work Station Computer
(Optional)
___ Concentrator Setup (Optional) ___ Software Misc. (Optional)
___ Network Wiring ___ Sensors ___ Sensor Wiring
___ ASM (Optional) ___ ASM Audio Wiring
(Optional)
Tools
1. Standard hand tools 3. RJ Tester 4, 6 & 8 Pins 5. ESD Mat and Wrist Strap
2. Multimeter 4. Hardware & Software Manuals
Visual Inspection (ü)
Inspect the following for excess wear and/or any visual signs of damage.
1. ___ General 4. ___ Reseat socketed
Components/connectors
7. ___ ASM Mounting
2. ___ Computers 5. ___ Connectors 8. ___ Cable insulation
3. ___ Concentrator Mounting 6. ___ Sensor Mounting 9. ___ Collector Mounting
Cleaning (ü)
1. ___ Clean all internals of dust 4. ___ Clean Sensor Work Area(s) 7. ___ Clean Infrared Tag
2. ___ Clean external surfaces 5. ___ Clean ASM Work Area(s)
3. ___ Clean ASM Area 6. ___ Clean All Computer Stations
Calibration (ü)
1. ___ N/A
Electrical Safety Checks (ü)
1. ___ Wall Receptacle Test
2. ___ Sensor Voltage Test
3. ___ Collector RJ Line Continuity Test