Installation Instructions

P.O. Box 9240 Canton, Ohio 44711 1-800-325-3945 e-mail: info@ironrock.com www.versatilebymetro.com
®
®
INDOOR / OUTDOOR
A product of Metropolitan Ceramics
QUARRY TILE AND THIN BRICK
1. Choose the Installation Area
Begin by choosing the area where you are going to install the thin brick. Versa
Tile® thin brick installs much like tile. Always check with local building codes
for proper installation guidelines.
Wet areas and areas outdoors will require more preparation for installation.
Consult the adhesive mortar manufacturer and the Tile Council of North
America’s Tile Handbook for details on installations. Some installation areas
are best left to the professional tile installer.
2. Items Needed for your Project
Determine how many bricks you will need for your project.
You will need the following to install your bricks:
2”x4” and screws to hang it, level, chalk line, grout bag, “dowel rods /tile
spacers (3/8”), heavy duty drill (to mix material),drill mixing attachment,notched
trowel (3/8”), tile sponges, hard bristle brush (not wire),thinset or adhesive,
grout, bucket(s), 3/8” brick joiner tool, small trowel, Wet saw or heavy duty tile
cutter, Rubber gloves.
Note: If floating the grout instead of using a grout bag, you will need a tile float
instead of a grout bag and joiner tool.
3. Preparation
Install the 2”x4” the full length across the bottom of your wall using a level to
make sure your wall is straight. You may decide to use a 2”x2” if you want your
wall to start closer to the floor. Make sure the board or boards you use are
straight. This will be the starting point for your wall and will hold the weight of
the bricks until the adhesive dries, so place a screw at each stud. Once your
wall is complete you will remove this ledge. and attach the trim for your room.
MET_TB_CM_11_16
4. Marking Guides
Measure up one foot from the ledge and snap a horizontal line with a chalk
line. Continue working up the wall every foot marking lines as you go. Make
sure these lines are parallel with the bottom ledge. These lines will be a guide
letting you know everything is level as you brick up the wall.
Steps 1 - 4
Versa TILE
®
Thin Brick Installation and Maintenance
M
A
D
E
I
N
T
H
E
U
S
A
C
A
N
T
O
N
,
O
H
I
O
AVAILABLE AT MENARDS®

Summary of content (6 pages)