Operating instructions

Instal. GAL
A
®
25 / 40
VERO DESIGN NV © all rights reserved +32 33 85 06 91
Installation instructions Operating instructions
G
A
L
A
Place a beam across. Keep a distance from 10 mm from the top of the frame.
Installation
using convection system
Step 5 + 6
Pull up the brickwork so that the flexibles for the warm air can be connected fluently with a 90° elbow.
Step 5 / Detail page 26
Step 6